Road and Bridge Conditions
Map (List View)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Check signage Reduced speed limit Single lane, alternating traffic flow arrangements will be required, and a reduced speed limit of 60km/h will be in place during work hours for the safety of workers and road users. Outside of work hours, two-lane, two-way traffic flow will be in place. Motorists should allow up to 10 minutes extra travel time. Oversize and overmass vehicles more than 4.6 metres wide intending to travel through the site should call the project team on 0411 021 138 prior to travel. |
Speed Limit | 60 |
Schedule | Affected All directions Weekdays - (7:00am - 6:00pm) Affected All directions Saturday - (8:00am - 1:00pm) |
Roads | New England Highway, Sandy Creek Bridge, Bolivia, Bolivia Siding Road |
View more details
Location: (-29.2932861, 151.9573185)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Reduced speed limit Check signage Portable traffic lights will be in place to allow motorists to pass in one direction at a time. Motorists are advised to allow approximately 15 minutes of additional travel time. Hills Lookout will be closed for the duration of work. Drivers of OSOM are required to contact the works supervisor Ben 0408 011 461 prior to travel |
Speed Limit | 60 |
Schedule | Affected Both directions Weekdays - (all day - ) |
Roads | Gwydir Highway, Gibraltar Range |
View more details
Location: (-29.445724, 152.3794609)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Check signage Exercise caution Traffic controllers will be on site to direct motorists. The speed limit outside work hours is 80km/h. OSOM to contact works supervisor on 0411 021 138 prior to travel |
Speed Limit | 40 |
Schedule | Affected Both directions Weekdays - (7:00am - 6:00pm) |
Roads | New England Highway, Bolivia Siding Road, Bolivia |
View more details
Location: (-29.299433, 151.949878)
Category | SCHEDULED ROADWORK, Bridge work, Planned |
Advice | Check signage Exercise caution Portable traffic lights on site 24/7 will allow motorists to pass in one direction at a time, via a side track around the new bridge. Drivers of OSOM are required to contact Works Supervisor Daniel 0429 037 023. Vehicles over 3m wide use wide load bays provided and follow advice on signage. Lane width restrictions in place, 3m lanes and 1m shoulders throughout worksite. |
Speed Limit | 40 |
Schedule | Affected Both directions Every Day - (all day - ) |
Roads | Bruxner Highway, Dumaresq River Bridge, Dumaresq Valley |
View more details
Location: (-29.1483424, 151.4298247)
No Traffic Cameras to display
Affected roads | Manners street will be affected. |
Est. Dates | 01/01/1970 10:00:00 am |
Location: (-29.054912, 152.015078)
Data Authority: Transport NSW
Checked 3 minutes ago